The Duration of a dynamic Task with some subtask ist not calculated correct.
In the Data-Tab in the Duration Field is a wrong Duration. You can change and save it, but nothing happens. Still the wrong duration.
It worked with 2.0-Release. Not working with CVS-Release from 8.4.2005 15:00.
Hope the problem gets clear.